First installation in Poland

Back

First installation in Poland In February 2017, ISIA commissioned the first two systems is Poland. The end user was approached and managed by Grundfos Poland (GPL) and its partner ENVAG. The customer required a 100% redundancy, so the solution includes the two systems perfectly equal, equipped with one U-type rector able to generate 10 kg/h of ClO2 and injection titanium pump able to inject the solution at 3 bars. The application is for waste water treatment (cianide reduction). This is the first projects delivered in Poland and represent a great achievement and collaboration between ISIA and the local sales company.