Successfully completed FAT for QP Dukhan Potable water pumping station

Back
V1560Rsmall

ISIA successfully completed the Factory Acceptance Test (FAT) of the Compact Chlorine Dioxide Production System for the Qatar Petroleoum Potable water Tanks Pumping Station and Chlorination building in Dukhan, Qatar.

The system is composed by No.2 Compact generator, with a production of 0.3 kg/h each, in order to guarantee a 2x100% complete reduction. 

The system has been sent at the end of November.

For more info about the project please see the project reference.